• HOME
  • COMPANY
    • ABOUT US
  • SERVICES
  • TEAM
    • COMPANY EVENTS >
      • QUARTERLY EVENTS
      • HOLIDAY DECOR / PARTY
      • COMPANY PICNIC 2021
  • PROJECTS
  • CAREERS
  • OUR CLIENTS
  • CONTACT US
  • WE ARE HIRING!
  • HOME
  • COMPANY
    • ABOUT US
  • SERVICES
  • TEAM
    • COMPANY EVENTS >
      • QUARTERLY EVENTS
      • HOLIDAY DECOR / PARTY
      • COMPANY PICNIC 2021
  • PROJECTS
  • CAREERS
  • OUR CLIENTS
  • CONTACT US
  • WE ARE HIRING!
Cartwright Nor Cal
  • HOME
  • COMPANY
    • ABOUT US
  • SERVICES
  • TEAM
    • COMPANY EVENTS >
      • QUARTERLY EVENTS
      • HOLIDAY DECOR / PARTY
      • COMPANY PICNIC 2021
  • PROJECTS
  • CAREERS
  • OUR CLIENTS
  • CONTACT US
  • WE ARE HIRING!

 PROJECTS

Brooks Truitt Dog Park
Placer County Government Center Master Plan Update
Aqua View Cell Tower
1414 E Street
The Didion and 2413 J Street
Delfino Farms Winery
The Kind Project - The project consisted of two identical three-story apartment buildings, +/- 28,800 SF each, and associated site improvements at the property identified as 600 4th Street (APN 010-464- 004) in the City of West Sacramento. The property is located along the south side of F Street between 4th Street and 5th Street. Site improvements included stormwater quality treatment control features to meet City of West Sacramento requirements. Image provided by Williams + Paddon
LDS Lincoln Stake Center - The project was to construct a 24,000 sf church with chapel, offices, classrooms, restrooms, and a cultural center that would accommodate various activities, a 240 sf landscaped parking lot, and a landscaped turf/playfield with a small pavilion. Cartwright services included Civil Site Improvements, Construction Documents, Bidding, and Construction Administration. Image provided by Porter Brothers
65th Street Student Housing - The project was to construct a new multi-story student housing building at the property identified as 1625 18th Street in the City of Sacramento. The ground level floor was comprised of parking with commercial, leasing, and facility service-related areas. Based on our review of the existing site conditions, it was anticipated that any off-site improvements would be limited to utility connections, two driveway removals on 65th Street, a new driveway on 65th Street, and minor sidewalk and Alley replacement. Past experience with the City indicated we were able to construct the required off-site improvements under an encroachment permit since the street lighting was adequate and was not impacted. Image provided by Tricap Development, LLC
Harter Park - The project was to develop a 100% Construction Document package for the Harter Park site located at the west side of Harter Parkway in Yuba City. The site consisted of approximately 5-acres, 40 space parking lot, picnic areas, play areas, sports field, basketball court, and utility connections. Cartwright services included civil construction documents; site demolition plan, grading/drainage/utility plan, stormwater quality plan, erosion control plan, civil site construction cost estimate, civil specifications, and project coordination. Years following the initial project scope, Cartwright was responsible for incorporating a new pavilion area into the original project design and improvement plans. The pavilion included a shaded picnic area and recreational games which are located in the southwest corner of the project site. Image provided by Quadriga Landscape Architect and Planning, Inc.
14th and C Street Residential
Cornerstone Dental
L32 Residential - The project was to subdivide three (3) existing parcels into 12 parcels for future single-family residential homes at the property identified as 1208, 1216, and 1222 32nd Street in the City of Sacramento. Cartwright services included tentative map, preliminary grading/drainage/sewer/water layouts, on-site and off-site civil construction documents, street lighting plans, a preliminary water study, final subdivision map, and construction/bid assistance. Image provided by Next Generation Capital
PCGC North Auburn Mercy Housing Art Sculpture
WellQuest Assisted Living
3348 S Street Multi-Family - The project included subdividing an existing single parcel into six (6) parcels and constructing six (6) 2 to 3-story loft style residential townhomes at the property identified as 3348 S Street, the Southwest corner of S Street and 34th Street, in the City of Sacramento. Each residential unit was separated from each other. It was anticipated that the proposed improvements would be predominately on-site only. Any off-site improvements would be limited to utility service connections and minor sidewalk replacement under a Driveway and Encroachment Permit. Cartwright services included boundary/topographic survey, tentative map, preliminary grading/drainage/sewer, and easement abandonment and dedication. Image provided by Tricap Development, LLC
1717 S Street Apartments - The project was to construct a new 236,408 square foot, 6-story mixed use building, located on the vacant 1.2-acre lot at 1717 S Street in the City of Sacramento. The project consisted of 159 apartment units and 11,376 square feet of ground floor commercial space. Cartwright services included boundary/topographic survey, lot merger, preliminary civil engineering, bidding/construction assistance, and processing a revocable encroachment permit through the City for approval. Rendering provided by Capital Area Development Authority
Maverik Oroville
Subtitle Art Installation
The Falls Roseville Event Center - The project was transferred from another engineering firm to Cartwright. All prior plans and documents were assembled and submitted to Cartwright to obtain approval of a Major Project Permit and negotiated Conditions of Approval, as well as the construction documents for permits. Cartwright was responsible for assisting with plan submittal, review comments, project coordination and permit approvals for the City Planning Department, City Building Department, City Environmental Utilities Department, City of Roseville Electric, Fire and Development Services. Cartwright services included site topographic/boundary survey, a geotechnical report, electrical engineering services, civil design, and landscape/irrigation architectural services. Image provided by Sierra View General Contractor
Township 9 - Township 9 is widely recognized as one of the signature projects throughout the Sacramento region. A dynamic, community centric urban infill project with a focus on mixed-use development while emphasizing an array of residential product, this project is uniquely situated within the River District of Sacramento, adjacent to the south bank of the American River and within close proximity to the Central Business District. Phase A of the project includes ten (10) garden style apartment buildings of approximately 378 units, a mid-rise (5-story) apartment building of approximately 171 units with below grade parking, a community Amenity Building, associated parking, and open space amenities to include a central public park and a series of localized private open spaces. Cartwright services included project coordination, planning entitlements, design development, construction documents, minor encroachment and driveway permit, project specific drainage study, construction support services, and agency submittals. Image provided by 29th Street Capital
Starbucks - 1801 Exposition Blvd - The project was to construct two new retail buildings, one 6,000 sf and the second 4,208 sf located at 1801 Exposition and Challenge Way in the City of Sacramento. The site required a drive thru, associated parking and patio areas as well as areas for stormwater quality or a proprietary unit. Cartwright services included boundary and topography survey, boundary line adjustment, tentative parcel map, final parcel map, civil entitlements, construction documents, and a Risk Level 2 Stormwater Pollution Prevention Plan (SWPPP). Image provided by Sierra View General Contractor
Icon at 13C - The project included subdividing an existing 0.59-acre project site into 21 condominium units for future residential townhomes at the property identified as 1300 and 1310 C Street in the City of Sacramento. Each residential unit was separated from each other but designed to meet multi-family/townhome building code requirements as they are condominium units. Cartwright services included on-site civil construction documents, off-site civil construction documents which included streetlight plans and a preliminary water study, final subdivision mapping services and construction/bid assistance. Image provided by Next Generation Capital
2030 28th Street
Sonrisa (1322 O Street Mixed Use) - The project was to construct a new approximately 4,500 square foot, 5-story mixed use building located at 1322 O Street in the City of Sacramento. The project consisted of approximately 45 affordable housing apartment units and ground floor retail space with residential amenity and utility areas. The site is directly adjacent to O Street to the north, Opera Alley to the south, and is located midblock between 13th Street and 14th Street. The site was state owned property consisting of a small event space building and parking lot and is approximately 0.24 acres in size. The existing parking lot and building were removed as part of this project. Cartwright services included preliminary civil engineering, preliminary sewer study, civil construction documents which included on-site and off-site, meetings with city engineering staff, and bidding/construction assistance. Image provided by Capital Area Development Authority
Truckee Public Service Center - Cartwright Nor Cal worked with ZFA Structural and the Town of Truckee on the civil design for an expansion to their existing Public Service Center/Public Works Facility situated at Donner Pass Road and Interstate 80 in Truckee, CA. The expansion included the addition of a new fueling station for the public works maintenance vehicles including improved site access and circulation. Our services included grading, drainage and utility design, and well as site demolition, striping/signage, and storm water quality design. Vehicular access and circulation were successfully negotiated with the various Public Center users (Public Works Administration Services, Police, and the Animal Services Shelter) and gaining Town Public Works maintenance staff approval.
PCGC North Auburn Mercy Housing
NorthPointe - The project was to subdivide the existing 3.45-acre project site for an approximately 38 single family residential home development located at the Southwest corner of Bridgecross Drive and Honor Parkway in the City of Sacramento. Cartwright services included due diligence, entitlement services, on-site and off-site construction documents, final mapping, on-site sewer design, and construction/bid services. Image provided by Next Generation Capital, Inc.